PRE-DEL INSPECTION CHECKLIST
Pre-Operation Inspection:
Check the following items before operating the unit to
assure that they are properly assembled. (See following page 1-4 for component location)
Saftey Equipment:
___
Operators Manual is with Unit.
___
The Safety Decals are installed as listed in the Assembly Manual.
___
Valve operation plate is installed.
___
Operators cage or Tractor Cab is in place
___
Deflectors are installed on the Mower Head
___
Tractor Rops or Cab with seatbels installed properly.
___
All Foot Guards and safety switch are installed and functional.
Frame:
___
Axle Plate Bolts are torqued.
___
Head Mounting Bolts tightened.
___
Frame attaching Bolts tightened.
___
Front Support Bolts are torqued.
___
Hydraulic Tank mounting Pins / Bolts in place correctly.
___
All Welds inspected toinsure proper welds and locations.
Hydraulic System:
___
Oil Level in Hydraulic Tank is within the sight gauge. (Item 5 page 1-4)
___
Hose connections are tight.
___
Hoses do not have any kinks or twist in them.
___
Front Pump Shaft adapter bolts are tight.
___
Front Pump Shaft Coupler / Drive Shaft is lubricated and has an anti-seize compound
on the Splines of Pump and Shafts.
___
The Pump Drive Shaft has correct alignment.
___
Suction Hose has no leaks or kinks.
Flail Mower Head:
___
Skid Shoe Bolts are torqued to 120 ft-lbs
___
Motor Bolts are torqued to 120 ft-lbs
___
Belt Alignment& tension adjustment is correct.
___
Cutter shaft bearings are properly lubricated
___
Roller bearings are properly lubricated
___
Blades swing freely.
___
All Pins and Clips for Rear Mower are installed
___
Clutch on Rear Mower has been checked for proper adjustment and conditions per
parts book reguirments.
___
All Belt guards are installed correctly.