4.5.13 Close the Top Cover
Before closing the top cover, make sure the following items have been completed:
The backplane is properly installed
The CPU card is properly installed
The PCI/ISA expansion cards are properly installed
The disk drives are properly installed into the drive bracket
The drive bracket is properly reinstalled into the workstation
All cables are properly connected
If all of the above listed items have been properly installed, close the top cover and
reinsert the previously removed retention screws.
4.6 Mounting the RPC-6010G Rackmount Workstation
The RPC-6010G workstation can be mounted to the posts of a standard 19” rack cabinet.
Adequate rails, rack tray, or side brackets should also be available for supporting the
weight of the workstation. Make sure that all cabling is correctly attached and carefully
routed when installing the workstation.
NOTE:
At least two people are required to mount the workstation. The rack or cabinet
into which the workstation is installed should provide adequate and sufficient
ventilation, grounding, power source, and stability features.