beautypg.com

Step five step six – WEATHER GUARD 1210 User Manual

Page 5

background image

Page 5 of 6

Place driver side rail assembly, from Step

One, into the driver side rear mounting

clamp. Fasten together using the pre-

drilled hole in the side rail and a 1/4-20 X

3/4" carriage bolt and 1/4-20 stop nut, from

the rail mounting hardware kit. Repeat the

process for the passenger side rail.

STEP

FIVE

STEP SIX

Using a center punch, mark the holes to

be drilled through the square holes on the

front mounting clamp. Remove the side

rails from the vehicle and drill the holes us-

ing a 5/16" drill bit. Fasten the side rails to

the mounting clamps using the 1/4-20 X

3/4" carriage bolts, 1/4" washers, and 1/4-

20 stop nuts, from the rail mounting hard-

ware kit.

1/4-20 X 3/4"

Carriage Bolts

To keep debris out of your eyes when

drilling, always wear protective eye wear.

CAUTION

Do not overtighten 1/4" fasteners.

IMPORTANT!

1/4-20 Stop Nuts

1/4" Flat Washers

1/4-20 X 3/4"

Carriage Bolt

1/4-20 Stop Nut

1/4" Flat Washer

This manual is related to the following products: