B. Mounting the Magnet and Magnet Hub

1. Place the bushing into the hub and insert

the key. The key is a side-to-side fit and

should not contact the top of the keyway.

2. Insert the locking setscrews loosely into

the bushing and slide the assembly onto

the shaft.

3. If the armature has been secured to the

shaft first, then adjust the magnet's

position to allow approximately 1/32-inch

between the two faces. (See Figure 3)

4. Secure the magnet's position on the shaft

by alternately tightening each setscrew

with a torque wrench to 175 in. lbs.

maximum torque. During the tightening

process, the bushing should be tapped

lightly to make certain it seats-in properly.

PCC-825, PCC-1000, PCC-1225,

PCC-1525 Clutch-Coupling Spline

Drive Armature

Installation Instructions

The illustration drawings, parts lists, and exploded

views for these units can be found beginning on

page 30.
Either the magnet half of the clutch unit or the

armature half of the unit may be mounted on the

shaft first, depending on the characteristics of each

application.

A. Assembling the Magnet and Magnet

Hub

1. Insert the lead wires through the rubber

terminal caps and into the collector ring.

The shorter wire goes into the hole in the

front of the ring (the side that will be

mounted to the magnet). The longer wire

goes through the ring and into the hole

in the back.
Press the bullet-type connectors firmly into

place. (See Figure 1)

2. Mount the magnet to the magnet hub using

capscrews and lockwashers.

(See Figure 2)

3. Secure the lead wires to the magnet

terminals with screws and lockwashers.

4. Pull the rubber caps over the terminals.

Figure 2

Short

Wire

Collector

Ring

Terminal

Cap

Long

Wire

Figure 1

Armature

Magnet

1/32-inch

Figure 3