Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 98
![background image](/manuals/353600/98/background.png)
The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
97
SAS Link and Transport Layer Test Suite v0.13
Test 9.6.4 - SSP ERROR HANDLING – Extra RESPONSE frame Received
Purpose: To determine that the DUT, an SSP Initiator port, responds properly when a RESPONSE frame is
improperly retransmitted.
References:
9.2.4.5 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator.
Revision History: September 28, 2004
Test Setup: The DUT and the Testing Station are physically connected.
Test Procedure (SSP Initiator):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is an initiator the Testing Station should transmit an Identify Address
frame indicating that it is a SAS Target.
• Allow the DUT to open an SSP connection to the Testing Station and transmit a SCSI INQUIRY
command.
• The Testing Station should open a connection to the DUT and transmit DATA and 2 RESPONSE
frames to the DUT. The second response frame should have the retransmit bit set to 1. Close the
connection.
Observable Results: Verify that if the DUT discards the second RESPONSE frame and does not transmit ACK or
NAK in response to it.