Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 82
![background image](/manuals/353600/82/background.png)
The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
81
SAS Link and Transport Layer Test Suite v0.13
Test 7.4.4 - Closing SSP Connections – CLOSE (NORMAL)
Purpose: To determine that the DUT properly responds when CLOSE (NORMAL) is received.
References:
7.16.6, 7.12.7 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator
Revision History: September 13, 2004
Test Setup: The DUT and the Testing Station are physically connected.
Test Procedure (Initiators):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is an initiator the Testing Station should transmit an Identify Address
frame indicating that it is a target.
• Wait for the DUT to open an SSP connection to the Testing Station. Allow the DUT to transmit a SCSI
Command to the Testing Station, then close the connection.
• The Testing Station should transmit an OpenAddress frame to the DUT. Wait for OPEN_ACCEPT
from the DUT, then transmit CLOSE (NORMAL)
Observable Results: Verify that the DUT transmitted CLOSE (NORMAL) within 1 msec of receiving CLOSE
(NORMAL) from the Testing Station.