Test 6.7.1.1: Support for SNW-3

Purpose

To verify the DUT's support for SNW-3.

References

6.7.4.2.2 SAS Standard

6.7.4.2.3.3 SAS Standard

Resource Requirements

A Protocol Generator/Analyzer capable of transmitting and receiving SAS OOB signals
and SAS 2.0 Speed Negotiation.

Modification Record

06-25-2007: Initial Draft (Michael Davidson).

06-29-2007: Fixed references, changed title numbering (Michael Davidson).

07-20-2007: Expanded procedure (Michael Davidson).

Discussion

If a phy supports SNW-3, then the phy:

a) transmits a 32-bit phy capabilities value describing the capabilities of they phy.
b) receives a 32-bit phy capabilities value from the attached phy. If the attached phy

does not support SNW-3, they phy capabilities bits are all set to zero (i.e., D.C.
Idle).

If a phy does not support SNW-3, then a phy:

a) transmits D.C. Idle.
b) ignores any SNW-3 phy capabilities bits received.

Test Setup

The DUT and the Testing Station are physically connected the the DUT is powered off.

Procedure

1. Power on the DUT.
2. The testing station is instructed to transmit COMINIT/COMRESET to the DUT.
3. The DUT is expected to respond with COMINIT/COMRESET.
4. The testing station is instructed to transmit COMSAS to the DUT.
5. The DUT is expected to respond with COMSAS.
6. Upon reception of COMSAS from the DUT, the Testing station is instructed to transmit

D.C. Idle for one RCDT. The DUT is expected to do the same.

7. Following RCDT, the testing station is instructed to transmit ALIGN(0) primitives at 1.5

Gbps for one SNTT. If the DUT supports 1.5 Gbps signaling, it is expected to do the
same. If the DUT does not support 1.5 Gbps signaling, it should continue to transmit
D.C. Idle.

8. The Testing station is then instructed to transmit D.C. Idle for one RCDT. If the DUT

supports 3.0 Gbps. The DUT is expected to do the same.

9. Following RCDT, the testing station is instructed to transmit ALIGN(1) primitives at 3.0

Gbps for one SNTT. If the DUT supports 3.0 Gbps signaling, it is expected to the same.

10. The Testing Station is then instructed to transmit D.C. Idle for one RCDT. The DUT is

expected to do the same.

11. The Testing Station is the instructed to transmit its Phy Capabilities bits indicating

UNH-IOL

SAS 2.0 Speed Negotiation

9 of 49