Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 32
The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
31
SAS Link and Transport Layer Test Suite v0.13
Test 7.5.5.1 - BREAK – OpenTimeout Timer SSP Target
Purpose: To determine that the DUT, an SSP target transmits BREAK after the OpenTimeout Timer expires.
References:
7.12.2.1, 7.12.6 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator
Revision History: September 13, 2004
Test Setup: The DUT and the Testing Station are physically connected.
Test Procedure (SSP Target):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an Edge Expander.
• The Testing Station should open an SSP connection to the DUT from another address, imitating a SAS
Initiator.
• Wait for the DUT to transmit OPEN_ACCEPT and RRDY. The Testing Station should transmit a
SCSI INQUIRY command to the DUT, then close the connection.
• Wait for the DUT to open an SSP connection to the Testing Station to the same address that sourced
the SCSI INQUIRY command.
• The Testing Station should wait for the DUT to transmit an OpenAddress frame for an SSP
connection. The Testing Station should not respond to the OpenAddress frame with OPEN_ACCEPT
or OPEN_REJECT.
Observable Results: Verify that 1msec after transmitting the OpenAddress frame, the DUT transmitted BREAK.