Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 38

The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
37
SAS Link and Transport Layer Test Suite v0.13
Test 9.2.1 - SSP Command IU – TAG
Purpose: To determine that the DUT properly sets the TAG field.
References:
9.2.1 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator. SAS Target with 2 LUNs within the same SSP
Target Port. If the DUT is an initiator, it will need to have software capable of generating SCSI traffic.
Revision History: February 8, 2005
Test Setup: The DUT and the Testing Station are physically connected. The DUT is not powered on.
Test Procedure (SSP Targets):
• Power on the DUT.
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an initiator.
• The Testing Station should open an SSP connection to the DUT. The Testing Station should transmit a
READ command to the DUT.
• Wait for the DUT to open an SSP connection to the Testing Station. Allow the DUT to transmit DATA
and SCSI Response to the Testing Station.
• The Testing Station should open an SSP connection to the DUT. The Testing Station should transmit a
WRITE command to the DUT.
• Wait for the DUT to open an SSP connection to the Testing Station. Allow the DUT to transmit
XFER_RDY, then the Testing Station should transmit a SSP DATA frame. Allow the DUT to transmit
a SCSI Response to the Testing Station.
Observable Results: If the DUT is a target, verify that the TAG in the XFER_RDY, DATA and RESPONSE
frames matched the TAG of the COMMAND frames which they corresponded to.