Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 84

The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
83
SAS Link and Transport Layer Test Suite v0.13
Test 7.4.6 - Closing SSP Connections – BREAK Sourced by DUT
Purpose: To determine that the DUT properly sources BREAK when required.
References:
7.12.7 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator
Revision History: September 13, 2004
Test Setup: The DUT and the Testing Station are physically connected.
Test Procedure (Initiators):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is an initiator the Testing Station should transmit an Identify Address
frame indicating that it is a target.
• Wait for the DUT to open an SSP connection to the Testing Station. Allow the DUT to transmit a SCSI
Command to the Testing Station.
• When the DUT transmits CLOSE (NORMAL) to close the connection, the Testing Station should not
transmit CLOSE (NORMAL) in response.
Observable Results: Verify that the DUT transmitted BREAK within 1 msec of transmitting CLOSE (NORMAL)
to the Testing Station.