Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 52

The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
51
SAS Link and Transport Layer Test Suite v0.13
Test 9.6.2 - SSP ERROR HANDLING – Invalid LUN
Purpose: To determine that the DUT, an SSP Target port, properly handles a TASK frame received with an invalid
LUN.
References:
9.2.2.2 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator.
Revision History: March 3, 2005
Test Setup: The DUT and the Testing Station are physically connected.
Test Procedure (SSP Target):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is a SAS Initiator.
• The Testing Station should open an SSP connection to the DUT and transmit a TASK frame of
function LOGICAL UNIT RESET with an invalid LUN. Close the connection
• Allow the DUT to open an SSP connection and transmit a SCSI response frame to the received TASK
frame.
Observable Results: Verify that the DUT sets the DATAPRES field to RESPONSE_DATA and the RESPONSE
CODE field to INVALD LOGICAL UNIT.