beautypg.com

Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 103

background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

102

SAS Link and Transport Layer Test Suite v0.13

Test 7.2.1 - Connections – OPEN_ACCEPT


Purpose: To determine that the DUT properly transmits RRDY after receiving OPEN_ACCEPT.

References:

7.12.2.2 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: February 15, 2005

Test Setup: The DUT and the Testing Station are physically connected.

Test Procedure (Expanders):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is an expander the Testing Station should transmit an Identify Address
frame indicating that it is an SMP initiator.

• The Testing Station should transmit an SMP Open Address frame to the DUT. Wait for the DUT to

transmit OPEN_ACCEPT and RRDY.



Observable Results:

• Verify that the DUT transmitted RRDY no more than 1 ms after transmitted OPEN_ACCEPT.