Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 62
The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
61
SAS Link and Transport Layer Test Suite v0.13
Test 10.1.7 - SCSI CDB – WRITE(10)
Purpose: To determine that the DUT, an SSP Target port, properly handles a WRITE(10) command.
References:
SBC-2 5.27
Resource Requirements: SAS Protocol Analyzer and Generator.
Revision History: September 28, 2004
Test Setup: The DUT and the Testing Station are physically connected.
Test Procedure (SSP Target):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is a SAS Initiator.
• The Testing Station should open an SSP connection to the DUT and transmit a SCSI WRITE
command for 2048 bytes. Close the connection
• Allow the DUT to open an SSP connection to the Testing Station and transmit XFER_RDY.
• The Testing Station should open a connection to the DUT and transmit 4 512 byte DATA frames.
Close the connection.
• Allow the DUT to open an SSP connection and transmit a SCSI RESPONSE frame to the received
command and data.
Observable Results: Verify that the DUT transmits RESPONSE frame indicating that the command completed
with GOOD status. Verify that the DUT transmitted ACK for every received DATA frame.