Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 117

The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
116
SAS Link and Transport Layer Test Suite v0.13
Test 7.5.7.1 - AWT Timer –ARBITRATION WAIT TIME
Purpose: To determine that the DUT, a SAS Expander, properly sets the AWT in an outgoing OpenAddress frame.
References:
7.12.3 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator. SAS Target.
Revision History: September 16, 2004
Test Setup: The DUT and the Testing Station are physically connected. The DUT is physically connected to a SAS
Target.
Test Procedure (SAS Expander):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is an expander with an attached target the Testing Station should
transmit an Identify Address frame indicating that it is an initiator.
• The Testing Station should open an SMP Connection to the DUT and transmit a REPORT_GENERAL
SMP Request. The DUT should transmit a REPORT_GENERAL SMP Response.
• The Testing Station should open an SMP Connection to the DUT and transmit a DISCOVER SMP
Request to the DUT Phy which is attached to the SAS Target. The DUT should transmit a DISCOVER
SMP Response with this information.
• The Testing Station should transmit an OpenAddress frame for an SSP Connection to the SAS Target
attached to the DUT, with an AWT of 5FFFh.
Observable Results: Verify that the DUT transmits an OpenAddress frame for an SSP Connection to the attached
SAS Target with an AWT of 5FFFh.