beautypg.com

Installation instructions, Airborne – Reese 5AB-E1621-610 5TH AIRBORNE User Manual

Page 3

background image

Installation Instructions

5

th

AIRBORNE

1. Before removing the original pin box, take note of the number of bolts used attaching the existing pin box to the

mounting wing set. Cequent Performance Products recommends using at least the same number of bolts upon

installation as removed from the original pin box. (Figure 5)

ASSEMBLY INSTRUCTIONS

Figure 5

Mounting Wing Set

2. Remove the existing pin box, taking care to remove any necessary wiring and/or break away switch if attached to the

pin box. (If removed, the break away switch must be reinstalled after installation is complete)

3. Install the 5

th

Airborne inside the mounting wings (Figure 6), with exception to tube style pin boxes. Cequent Performance

Products recommends replacing the mounting bolts, nuts, and lock washers with the same size & grade as the bolts

removed from the original pin box. Torque all bolts to the proper value listed in table 1.

z

2009 Cequent Performance Products

Sheet 3 of 5

5ABIN

05-28-09

Rev. C

Form: F205 Rev A 5-6-05

Note: Installing the front bolts first may ease alignment.

1/2” Bolts GR5

90 ft-lbs

5/8” Bolts GR5

150 ft-lbs

3/4” Bolts GR5

275 ft-lbs

Bolt Diameter

Torque

Table 1

WARNING: The 5

th

Airborne pin box is heavy, take care to maintain

adequate support under the 5

th

Airborne arm until at least 2 bolts per side are

installed. Failure to do so may result in death or serious injury.

Figure 6