Forward – Reese 30852 RAIL KIT User Manual
Page 7

6.
Remove ground wire from the frame. Use an 18mm socket to remove all of the bed bolts. Then raise and support
the truck bed.
7.
Insert base rails as shown in the following steps (
Figures 10 through 13
). Refasten truck bed bolts after rails are
inserted. Torque bed bolts to 75 ft. lbs.
Fuel
Cell
Front Hat Channel
Rear Hat Channel
Forward
Rear Hat Channel
Front Hat Channel
Fuel
Cell
F
F
Axle
Axle
Exhaust
Exhaust
Step 1 : Slide the base rail system in
bet een the hat channels Lift and
Figure 10
Figure 11
F
r
a
m
e
F
r
a
m
e
Step 2 : Position the base rail system near
the rear hat channel as sho n so that it
between the hat channels. Lift and
position it so that it rests on the frame.
the rear hat channel as shown so that it
rests evenly on both sides of the frame.
8.
Loosely attach clamping brackets (5) to frame using 1/2” x 6.5” hex head bolts (6) and 1/2” lock washers (7). Hand
tighten keeping the flat portion of the bracket even on the bottom of the frame. (
Figure 12
). Be sure that the rail
holes align with holes in the bed.
Forward
Figure 12
5
7
6
30852IN – 16FEB11A
PCN14335
©2011 CEQUENT PERFORMANCE PRODUCTS, INC.
LITHO IN USA
7