Section 2: Installation

08/13

9

51219 -- Rev. 6

2.1 General Service Policy, continued

4. The installing technician is responsible to make certain that personnel

are fully trained and familiar with the equipment's capabilities and
limitations before the installation is considered complete.

5. The complete installation consists of:

Verifying the application

Unpacking

Instrument checkout

6.

Customer and site readiness:

Is the location ready?

Is the load receiver ready?

Is the customer aware there may be work disruptions?

Are the operators available for training?

Platform connections, both electrical and mechanical

Calibration and Adjustment

Customer training

2.2. Pre-Installation Checklist

The following items should be checked before the
equipment is installed.

1. Has the application been checked to make certain
that it is within the capabilities and design parameters
of the equipment?

2. If the installation will disrupt normal operations, have arrangements
been made?

3. Is properly-grounded power available at the installation location?

4. Will the equipment operator(s) be available for training?

5. Has the technician thoroughly reviewed the installation procedures?