2.3. Unpacking

1. Check that all components and accessories are on
hand, and agree with the order.

2. Remove all components from their packing material.

3. Check to make certain that all parts are accounted for
and no parts are damaged.

4. Advise the shipper immediately if damage has occurred.

5. Order any parts necessary to replace parts that have been damaged.

6. Keep the shipping container and packing material for future use.

7. Check the packing list.

8. Collect all necessary installation manuals for the instrument and
accessories.

9. Open the Instrument and perform an inspection, making certain that all
hardware, electrical connections, and PC Assemblies are secure. Do not
reinstall cover if final installation is to be performed after the pre-
installation checkout.

2.4. Equipment Location

The instrument should be positioned away from
direct sunlight.

2.5. Safety

As is the case with any material handling equipment, certain safety
precautions should be observed during operation:

1. Never load the platform beyond its rated capacity. Refer to the rating