Sl preparation for work – Diamond Products SL User Manual
Page 17
![background image](/manuals/339237/17/background.png)
3.4
Secure construction site
Secure danger zone and make sure that nobody
enters that zone during active work.
3.5
Secure part to be sawn out
Secure the parts to be sawed
out in their initial position, such
that...
1)
... the rope will not be jam
2)
... nobody will be endangered by un-
controllable motion of the parts
being sawed out. Depending on si-
tuation utilize these auxiliary means
or a combination thereof:
–
Wedges
–
Connecting straps
–
Supporting it
–
Suspending it by crane or from building
Secure the parts being sawed out according to
their weight (approx. 2.5 to per m
3
)
(~200 lbs. per cu.ft) and position.
Example:
Securing with prop-jacks in three steps
(Cut into the ceiling, view from below!)
Fig. sichern.tif
SL
Preparation for work
sl9806e
page 17