beautypg.com

Magnum Venus Plastech ULTRABOND 10:1 ADHESIVE UNIT User Manual

Page 28

background image

UltraBond 10:1 Operations Manual

Rev. 12/2012

Page | 28

14.

The Activator Ram Pump should begin to stroke, check for leaks on all stainless steel hose
connections. Activator will flow through the Main Activator Pump and Activator Manifold to the gun /
dispense head.

15.

Secure leaks, if any

16.

Allow Activator Ram Pump to continue pumping until there is a steady air free flow of activator.

17.

Close dispensing head / gun

18.

Position outlet of head / gun over a flush container

19.

Press air purge button, a sudden purge of material from dispensing head is likely and could splash,
so be cautious (see fig. 32 or 33)

fig. 32

fig. 33


20.

Allow air to flow for 3-4 seconds (see fig. 25 or 25a)

21.

Press flush button to solvent purge for 3-4 seconds and again watch for splashing

22.

Repeat flush process for both Adhesive and Activator several times.