Maintenance, Maintenance chart, Batteries – Controlled Products Systems Group LA500 User Manual
Page 31: Additional features, Liftmaster internet gateway

29
NOTES:
• Severe or high cycle usage will require more frequent maintenance checks.
• It is suggested that while at the site voltage readings be taken at the operator. Using a digital voltmeter, verify that the incoming voltage to the operator it is within ten
percent of the operator’s rating.
Disconnect all power (AC, solar, battery) to the operator before servicing. The operator's AC Power switch ONLY turns off AC power to the control board and
DOES NOT turn off battery power. ALWAYS disconnect the batteries to service the operator.
MAINTENANCE CHART + BATTERIES
MAINTENANCE
MAINTENANCE CHART
DESCRIPTION
TASK
CHECK AT LEAST ONCE EVERY
MONTH
6 MONTHS
3 YEARS
Entrapment Protection Devices
Check and test for proper operation
X
Warning Signs
Make sure they are present
X
Manual Release
Check and test for proper operation
X
Gate
Inspect for wear or damage
X
Accessories
Check all for proper operation
X
Electrical
Inspect all wire connections
X
Mounting Hardware
Check for tightness
X
Operator
Inspect for wear or damage
X
Batteries
Replace
X
BATTERIES
Batteries will degrade over time depending on temperature and usage. For best performance, the batteries should be replaced every 3 years. Use only LiftMaster part
29-NP712 for replacement batteries. The standard control box comes with two 7AH batteries.
Two 33AH (A12330SGLPK) may be used in place of the 7AH batteries for a Large Metal Control Box solar installation. A battery tray (model K10-36183) and battery harness
(model K94-36596) are required for 33AH applications.
The batteries contain lead and need to be disposed of properly. Batteries do not perform well in extremely cold temperatures.
The operator alarm will beep 3 times with a command if the battery is low.
USING THE RESET BUTTON ON THE OPERATOR
1
Connect the ethernet cable to the LiftMaster Internet Gateway and the
router.
2
Connect power to the LiftMaster Internet Gateway.
3
Create an online account by visiting www.myliftmaster.com.
4
Register the LiftMaster Internet Gateway.
5
Use an internet enabled computer or smartphone to add devices. The
LiftMaster Internet Gateway will stay in learn mode for three minutes.
6
Ensure gate is closed.
7
Give the operator an OPEN command.
8
Within 30 seconds, when the gate is at the open limit press and release the
reset button 3 times (on primary gate) to put primary operator into High
Band Learn Mode (the operator will beep as it enters learn mode). The
LiftMaster Internet Gateway will pair to the operator if it is within range
and the operator will beep if programming is successful.
USING THE LEARN BUTTON ON THE OPERATOR’S CONTROL BOARD
1
Connect the ethernet cable to the LiftMaster Internet Gateway and the
router.
2
Connect power to the LiftMaster Internet Gateway.
3
Create an online account by visiting www.myliftmaster.com.
4
Register the LiftMaster Internet Gateway.
5
Use an internet enabled computer or smartphone to add devices. The
LiftMaster Internet Gateway will stay in learn mode for three minutes.
6
Press the Learn button twice on the primary operator (the operator will
beep as it enters learn mode). The LiftMaster Internet Gateway will pair to
the operator if it is within range and the operator will beep if programming
is successful.
LIFTMASTER INTERNET GATEWAY
To program the operator to the LiftMaster Internet Gateway:
OR
The status as shown by the LiftMaster Internet Gateway app will be either “open” or “closed”. The gate operator can then be controlled through the LiftMaster Internet
Gateway app.
LIFTMASTER INTERNET GATEWAY
ADDITIONAL FEATURES