POWER WIRING CONTINUED...
POWER WIRING + CONNECT BATTERIES
WIRING
NOT PROVIDED. SEE ACCESSORIES.
The solar panel(s) must be located in an open area clear of obstructions and shading
for the entire day. The gate operator is not supported in northern climates where
temperatures reach below -4˚F. This is due to cold weather and a reduced number of
hours of sunlight during the winter months. Cycle rate may vary from solar chart for
areas that reach below 32˚F. Solar panels should be cleaned on a regular basis for
best performance to ensure proper operation. For solar applications, a minimum of
two 10W solar panels in series and two 7AH batteries are recommended. For Zone 3
cold weather sites, two 33AH batteries are recommended (for Large Metal Control
Box (XLM) ONLY). We recommend LiftMaster low power draw accessories to minimize
power draw, refer to accessory page. We recommend disconnecting the expansion
board for greater cycle ratings and standby time for solar applications. NOTE: Solar
power maximum is 24 Vdc at 50 watts maximum.
1
Locate the solar/charge plug on the control board and remove the transformer
wires from the plug.
2
Connect the red wire (+) from one solar panel to the black wire (-) of the other
solar panel.
3
Connect the remaining red (+) wire from one solar panel to the solar/charge
plug (+) on the control board.
4
Connect the remaining black (-) wire from the other solar panel to the
solar/charge plug (-) on the control board.
5
Plug in the solar/charge plug.
SOLAR PANEL(S)
NOT AVAILABLE
NOT AVAILABLE
1
1
1
2
3
3
2
NUMBER OF CYCLES PER DAY (SOLAR)
Swing Gate Installation (6 ft. 1200 lb. gate/19 ft. 500 lb.)
Single Gate
CONFIGURATION
ZONE 1
(6 Hrs
sunlight/day)
ZONE 2
(4 Hrs
Sunlight/day)
ZONE 3
(2 Hrs
Sunlight/
day)
Low Band
High Band
Expansion Board
1 Loop (LD7LP)
7AH Batteries (standard)
33AH Batteries (optional)
7AH Batteries (standard)
33AH Batteries (optional)
7AH Batteries (standard)
33AH Batteries (optional)
20W SOLAR PANEL
NOTE: 20W would be two 10W
(12V) panels in series.
120 154
76
96
33 38
✔
117 151
74
93
30 35
✔
✔
111 144
68
87
25 29
✔
✔
109 142
66
84
23 27
✔
✔
✔
✔
99
131
56
74
13 17
40W SOLAR PANEL
NOTE: 40W would be two 20W
panels in series.
156 202
101 128 45 54
✔
154 199
98
125 42 51
✔
✔
148 193
92
119 37 45
✔
✔
145 190
90
117 35 43
✔
✔
✔
✔
135 179
80
106 25 33
Red
Black
(to solar panels)
1
Turn OFF AC power to the operator at the circuit breaker.
2
Plug the battery connector to the J15 plug labeled BATT(-)(+) DC(-)(+) on the
control board. The control board will power up.
3
Turn ON AC power to the operator.
CONNECT BATTERIES
The batteries are charged in the circuit by the transformer or solar panel.
STANDARD CONTROL BOX
Battery
Connector
J15 Plug
Dual Gates
20W SOLAR PANEL
NOTE: 20W would be two 10W
(12V) panels in series.
54
69
34
43
15 17
✔
53
68
33
42
13 16
✔
✔
50
65
31
39
11 13
✔
✔
49
64
30
38
10 12
✔
✔
✔
✔
45
60
25
33
6
7
40W SOLAR PANEL
NOTE: 40W would be two 20W
panels in series.
71
92
46
58
20 24
✔
70
90
44
57
19 23
✔
✔
67
87
42
54
16 20
✔
✔
66
86
41
53
16 19
✔
✔
✔
✔
62
81
36
48
11 15