beautypg.com

Connect batteries, Wiring, Power wiring continued – Controlled Products Systems Group LA500 User Manual

Page 25

background image

23

LOCK

N.O.

CO

M

+ -

+ -

ACCESSOR

Y

POWER

ON SW

.

EXP

.

BOARD

CLASS 2 SUPPLY

24 VOLTS

+ -

SOLAR /
CHARGER

J15

+ -
BATT

- +

DC

POWER

ID RESET

ALARM

GROUND

BR GRN WT YE BLU RED

BR GRN WT YE BLU RED

+

-

-

+

POWER WIRING CONTINUED...

POWER WIRING + CONNECT BATTERIES

WIRING

NOT PROVIDED. SEE ACCESSORIES.
The solar panel(s) must be located in an open area clear of obstructions and shading

for the entire day. The gate operator is not supported in northern climates where

temperatures reach below -4˚F. This is due to cold weather and a reduced number of

hours of sunlight during the winter months. Cycle rate may vary from solar chart for

areas that reach below 32˚F. Solar panels should be cleaned on a regular basis for

best performance to ensure proper operation. For solar applications, a minimum of

two 10W solar panels in series and two 7AH batteries are recommended. For Zone 3

cold weather sites, two 33AH batteries are recommended (for Large Metal Control

Box (XLM) ONLY). We recommend LiftMaster low power draw accessories to minimize

power draw, refer to accessory page. We recommend disconnecting the expansion

board for greater cycle ratings and standby time for solar applications. NOTE: Solar

power maximum is 24 Vdc at 50 watts maximum.

1

Locate the solar/charge plug on the control board and remove the transformer

wires from the plug.

2

Connect the red wire (+) from one solar panel to the black wire (-) of the other

solar panel.

3

Connect the remaining red (+) wire from one solar panel to the solar/charge

plug (+) on the control board.

4

Connect the remaining black (-) wire from the other solar panel to the

solar/charge plug (-) on the control board.

5

Plug in the solar/charge plug.

SOLAR PANEL(S)

NOT AVAILABLE

NOT AVAILABLE

1

1

1

2

3

3

2

NUMBER OF CYCLES PER DAY (SOLAR)

Swing Gate Installation (6 ft. 1200 lb. gate/19 ft. 500 lb.)

Single Gate

CONFIGURATION

ZONE 1

(6 Hrs

sunlight/day)

ZONE 2

(4 Hrs

Sunlight/day)

ZONE 3

(2 Hrs

Sunlight/

day)

Low Band

High Band

Expansion Board

1 Loop (LD7LP)

7AH Batteries (standard)

33AH Batteries (optional)

7AH Batteries (standard)

33AH Batteries (optional)

7AH Batteries (standard)

33AH Batteries (optional)

20W SOLAR PANEL
NOTE:
20W would be two 10W

(12V) panels in series.

120 154

76

96

33 38

117 151

74

93

30 35

111 144

68

87

25 29

109 142

66

84

23 27

99

131

56

74

13 17

40W SOLAR PANEL
NOTE:
40W would be two 20W

panels in series.

156 202

101 128 45 54

154 199

98

125 42 51

148 193

92

119 37 45

145 190

90

117 35 43

135 179

80

106 25 33

Red

Black

(to solar panels)

1

Turn OFF AC power to the operator at the circuit breaker.

2

Plug the battery connector to the J15 plug labeled BATT(-)(+) DC(-)(+) on the

control board. The control board will power up.

3

Turn ON AC power to the operator.

CONNECT BATTERIES

The batteries are charged in the circuit by the transformer or solar panel.

STANDARD CONTROL BOX

Battery

Connector

J15 Plug

Dual Gates

20W SOLAR PANEL
NOTE:
20W would be two 10W

(12V) panels in series.

54

69

34

43

15 17

53

68

33

42

13 16

50

65

31

39

11 13

49

64

30

38

10 12

45

60

25

33

6

7

40W SOLAR PANEL
NOTE:
40W would be two 20W

panels in series.

71

92

46

58

20 24

70

90

44

57

19 23

67

87

42

54

16 20

66

86

41

53

16 19

62

81

36

48

11 15

This manual is related to the following products: