Flomega, liquid mfc’s/mfm’s – Brooks Instrument 5882/92 User Manual
Page 10

10
Installation and Operation Manual
X-TMF-FM-MFC-eng
PN 541-C-007-AAG
April, 2008
Flomega, Liquid MFC’s/MFM’s
2-1
General
This section contains the procedures for the receipt and installation of the instrument. See Section 1 for
dimensional and connection requirements. Do not attempt to start the system until the instrument has
been permanently installed. It is important that the start-up procedures be followed in the exact sequence
presented.
2-2
Receipt of Equipment
When the instrument is received, the outside packing case should be checked for damage incurred during
shipment. If the packing case is damaged, the local carrier should be notified at once regarding his liability.
A report should be submitted to your nearest Product Service Department.
Brooks Instrument
407 W. Vine Street
P.O. Box 903
Hatfield, PA 19440 USA
Toll Free (888) 554-FLOW (3569)
Tel (215) 362-3700
Fax (215) 362-3745
E-mail: [email protected]
www.BrooksInstrument.com
Brooks Instrument
Brooks Instrument
Neonstraat 3
1-4-4 Kitasuna Koto-Ku
6718 WX Ede, Netherlands
Tokyo, 136-0073 Japan
P.O. Box 428
Tel 011-81-3-5633-7100
6710 BK Ede, Netherlands
Fax 011-81-3-5633-7101
Tel 31-318-549-300
Email: [email protected]
Fax 31-318-549-309
E-mail: [email protected]
Remove the envelope containing the packing list. Carefully remove the instrument from the packing case.
Make sure spare parts are not discarded with the packing materials. Inspect for damaged or missing parts.
2-3 Recommended Storage Practice
If intermediate or long-term storage of equipment is required, it is recommended that the equipment be
stored in accordance with the following:
a.
Within the original shipping container.
b.
Stored in a sheltered area, preferably a warm, dry, heated warehouse.
c.
Ambient temperature of 70° F (21° C) nominal, 109° F (43° C) maximum,
45° F (7° C) minimum.
d.
Relative humidity 45% nominal, 60% maximum, 25% minimum.
Upon removal from storage a visual inspection should be conducted to verify the condition of equipment
is “as received”.
Section 2 Installation