Draw-Tite 59853 ROOF RACK User Manual
Draw-Tite For the car

Direct Mount Track Rail System TR42
For use on sheet metal surfaces
For use with ROLA APE and APX cross bar kits
PART No.
Tools required to install
K
IT
C
O
M
P
O
N
E
N
T
S
59853
Part
Description
Qty
A
Button head bolt M5 x 20mm
10
B
Nylon washer
10
C
Plus Nut Insert M5
10
D
Hex bolt M5 x 30mm
1
E
Hex Nut M6
1
F
Washer M5
1
G
Star Washer M5
10
H
3mm (.125”) Drill Bit
1
I
.290 Dia. (“L”) Drill bit
1
J
Hex Key- 3mm
1
K
Silicone sealant
1
L
Track and Isolator pad
2
M
Track End Cap- closed (Front)
2
N
Track End Cap- open (Rear)
2
D
E
F
G
A
B
C
H
I
J
K
L
M
N
A
C
F
H
Tools required:
A
Masking tape
F
Tape measure
B
Fine tip marker
G
Hammer
C
Center punch
H
Drill motor
Placement of Track Rails onto Vehicle surface (Crew Cab Truck shown)
Page 1 of 2
Align Tracks parallel to each other and equal distance
from rear.
Hint: pre-installing your ROLA cross bars on the tracks
will insure good placement.
Using a fine tip marker mark every other hole in track. Insure to mark the
holes on each end of the tracks.
DO NOT mark or drill every hole as it is not required.
Hint: Use masking tape to hold the tracks well in place while marking.
Isolator pad can be removed while marking.
Then use a center punch to set the drill position.
Use of ROLA track systems with Plus Nuts is intended for sheet
metal installations.
Install requires drilling and permanent installation of tracks.
Installation requires some tools and skill. If concerned please
have professionally installed.
Caution- never exceed the load rating for your
vehicle (contact manufacturer for details), or that
of your cross bar system which ever is lower.
Precaution Warnings before beginning
Printed in China
B
D E
G
I
59853N Rev B 4-15-13
C
Center punch
H
Drill motor
D
8mm wrench
I
Safety glasses
E
10mm wrench
Mark every other hole in track