12
START
STOP
FUNC.
SPEED
ENTER
F/R
ANTRIEBSTECHNIK
150
6”
30
1”
100
4”
START
STOP
FUNC.
SPEED
ENTER
F/R
ANTRIEBSTECHNIK
3. Installation and Connection
3.1 Control Cabinet Installation
Enclosure type:
IP20/ Open Type
Operation temperature:
-10...45 °C / 14...113°F
Storage temperature:
-25...70 °C / -13...158°F
max. heat sink temperature:
90 °C / 194°F
Climatic category:
3K3 in accordance with EN 50178
Relative humidity:
max. 95 % without condensation
Power derating for high altitude:
1% for every 100m/330ft
above 1000m/3300ft
Maximum altitude for operation:
2000m / 6,600ft
Installation requirements:
• Mount in a stationary location with low vibration. Contact KEB
when mounting on a moving system.
• Adhere to minimum clearance distances in diagram 3.1.
Multiple units can be mounted side by side with zero clearance.
• Most units have forced airflow from bottom to top using a thermostatically controlled
variable speed fan. Leave space above and below the unit for proper air flow.
• Prevent dust or debris from entering the unit, especially during the construction of the
control panel. Metal chips can cause internal shorts or malfunctions.
• Installation in a sealed enclosure requires proper cooling, be sure to over size control
cabinet or provide suitable cooling device.
• Protect the unit against conductive and corrosive gases and liquids.
• Water, mist, or steam should not be allowed into the unit.
• Do not allow water to condense within the unit
• The COMBIVERT F5 must not be installed in a “Explosion Proof” environment.
Dia. 3.1