Eave detail gable detail – ATAS Field-Lok User Manual
Page 2
Eave Detail
Gable Detail
1. Apply ATA-Shield** along eave and up the roof
to a point at least 24” beyond outside face
of exterior wall.
2. Install 3/8” shim at eave.
3. Install drip edge against fascia trim.
Lay ATA-Guard* over eave trim.
4. Trim (cut) both seams back to allow for turn down.
Install panel by sliding lower flanged edge
over drip edge.
5. See below for proper panel sidelap installation.
General Note: Before any installation be sure to lay
ATA-Shield** in all areas where ice & water can occur.
ATA-Guard or appropriate underlayment should be
installed over the entire roof.
1. Install underlayment to gable edge.
Place 3/8” shim as shown.
2. At gable start detail, install gable trim starter cleat
with appropriate fasteners at 2’-0” into fascia board.
3. At end gable, cut panel to appropriate width to
allow room for clips at gable end. If panel cut off is
3” or wider install cut off portion of panel
underneath last panel w/ butyl tape applied in
between the two panels and install clips before
installing gable assembly.
4. Apply double-faced butyl sealant as circled in
sketch. Fasten “Z” closure to panel with pop-rivets.
5. Install starter cleat at end detail same
as start detail.
6. At both ends snap gable/rake trim over starter
cleat and “Z” closure to-Lok into place. Pop-rivet
these two pieces together with one pop-rivet
per trim length.
Underlayments: ATA-Shield** is the recommended self adhesive
underlayment for eaves, sidewall and any critical areas exposed to ice
damming and extensive water run off.
Available in 65’-8” x 39-3/8” rolls (200 sq. ft. per roll).
Underlayments: ATA-Guard* is a polyolefin based, 100%
asphalt free, high strength reinforced roofing
underlayment for use beneath metal roofing on steep
slope applications. 1000 sq. ft. per roll at 48” wide.
PANEL SIDELAP