10 commissioning, 10 commissioning -42 – YSI DIQ/S 182-MOD System 182 User Manual
Page 56
Installation
System 182
3 - 42
ba76025e01
02/2012
3.10
Commissioning
Start checklist and
system start
Before starting the system, carry out the system check using the
following checklist. Always carry out the check
before the initial commissioning
before any further commissioning if the system has been previously
extended or modified.
Starting the system
Switch on the voltage supply of the Universal Transmitter and all
additional power supply modules. As soon as the system is
successfully initialized, the measured value display appears. In the
case of IQ sensors that are not yet providing measured values, "Init"
appears temporarily
Fig. 3-32 Display during the start phase
Note
Assign a name to each IQ sensor after putting it into operation for the
first time so you can identify it more easily. How to assign a sensor
name is described in section 5.3 on page 5-2.
Note
If the system start failed, see chapter 9 W
Start checklist
1 Are all system components correctly connected with one
another (see section 3.4)?
2 Is the Universal Transmitter and all additional power supply
modules correctly connected to the voltage supply (see
section 3.7)?
3 Do the line voltage and line frequency agree with the data on
the name plate of the Universal Transmitter and all additional
power supply modules?
4 Are all IQ sensors ready for measuring, e.g. a D.O. sensor
filled with electrolyte solution?