beautypg.com

Fig. 19 – Pro Series 30118 20K FIFTH WHEEL User Manual

Page 10

background image

Fig. 19

ADDITIONAL MOUNTING INSTRUCTIONS:

Install base rails as instructed in base rail instructions. The instruction below is for the addition
of the 2 center bolts.

1

Pl

b

il i

d

ith b

il

ti

i t

ti

T

t k

th

l

t th

1.

Place base rails in accordance with base rail mounting instructions. Try to keep them as close to the cross
member under the bed as possible.

2.

BEFORE DRILLING ANY HOLES, CHECK FOR CLEARANCE AROUND THE GAS TANK.

3.

Using the center hole in the base rail as a guide, drill a ½” hole through the truck bed.

4.

Insert ½” carriage bolt (29) into the hole. Install ½” serrated washer (31), ½” lock washer (32) and ½” nut (33).

5.

Insert spacer (30) between the truck bed and the base rail. It will go in between at the corrugation of the bed.

6.

Repeat for the other base rail.

7.

Torque the ½” nuts to 75 ft/lbs.

30118IN 29JULY09B

PCN12190

©2009 CEQUENT PERFORMANCE PRODUCTS PRINTED IN XXXX

10