beautypg.com

Pro Series 51147 51 Receiver User Manual

Installation instructions, Nissan frontier suzuki equator, Part numbers

background image

Installation Instructions

Nissan Frontier

Suzuki Equator

Part Numbers:

51147

Hitch Shown In Proper Position

Equipment Required:

Wrenches: 19mm

Drill Bits: None

1.

Raise hitch into position and install fasteners as shown above.

z

2009 Cequent Performance Products

Sheet 1 of 3

51147N

8-11-09

Rev. A

1

Qty. (6)

Hex Bolt M12 x 1.25 x 35mm

3

Qty. (6)

Flat Washer

2

Qty. (6)

Lock Washer

Tighten all M12 CL8.8 fasteners with torque wrench to 68 Lb.-Ft. (92 N*M)

Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to

prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working

beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5

and SAE J684.

Fastener Kit: 51147F

Do Not Exceed Lower of Towing Vehicle

Manufacturer’s Rating or

Hitch type

Max Gross

Trailer WT (LB)

Max Tongue

WT (LB)

Weight Distributing

8,000 (3 632 Kg)

800 (363 Kg)

Weight Carrying

Ball Mount

5,000 (2 270 Kg)

500 (227 Kg)

Wiring Access Location: PU3

Form: F205 Rev A 5-6-05

Bumper

Existing weldnuts

Frame rail

Vertical plate present
On some models

Note: Fasteners typical both sides

3

2

1