Pro Series 51147 51 Receiver User Manual
Installation instructions, Nissan frontier suzuki equator, Part numbers
Installation Instructions
Nissan Frontier
Suzuki Equator
Part Numbers:
51147
Hitch Shown In Proper Position
Equipment Required:
Wrenches: 19mm
Drill Bits: None
1.
Raise hitch into position and install fasteners as shown above.
z
2009 Cequent Performance Products
Sheet 1 of 3
51147N
8-11-09
Rev. A
1
Qty. (6)
Hex Bolt M12 x 1.25 x 35mm
3
Qty. (6)
Flat Washer
2
Qty. (6)
Lock Washer
Tighten all M12 CL8.8 fasteners with torque wrench to 68 Lb.-Ft. (92 N*M)
Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to
prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working
beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5
and SAE J684.
Fastener Kit: 51147F
Do Not Exceed Lower of Towing Vehicle
Manufacturer’s Rating or
Hitch type
Max Gross
Trailer WT (LB)
Max Tongue
WT (LB)
Weight Distributing
8,000 (3 632 Kg)
800 (363 Kg)
Weight Carrying
Ball Mount
5,000 (2 270 Kg)
500 (227 Kg)
Wiring Access Location: PU3
Form: F205 Rev A 5-6-05
Bumper
Existing weldnuts
Frame rail
Vertical plate present
On some models
Note: Fasteners typical both sides
3
2
1