Wayne-Dalton TORQUEMASTER 6100 User Manual
Page 17
Tools Needed:
17
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the
Find a Dealer section online at www.wayne-dalton.com
Top Section
15
hammer
step ladder
NaIl
TOP sECTION
Place the top section in the opening.
Temporarily secure the top section by
driving a nail in the header near the
center of the door and bending it over
the top section.
Now, flip up hinge leafs, hold tight
against section, and fasten center
hinges first, and end hinges last. (Refer
to step 12).
Position flagangle between 1-11/16”
(43 mm) to 1-3/4” (44 mm) from the
edge of the door; tighten the bottom
lag screw. flagangles must be parallel
to the door sections. Repeat for
opposite side.
IMPORTANT: ThE DIMENsION
bETWEEN ThE flaGaNGlEs MusT bE
DOOR WIDTh Plus 3-3/8” (86MM) TO
3-1/2” (89 MM) fOR sMOOTh, safE
DOOR OPERaTION.
Complete the vertical track installation
by securing the center jamb bracket(s)
and tightening the other lag screws.
Repeat for opposite side.
DOOR WIDTh
+ 3-3/8” TO 3-1/2”
INST
All
ATION
1-11/16” TO 1-3/4”
flaGaNGlE
TOP
sECTION