Wayne-Dalton TORQUEMASTER 6100 User Manual
Page 10
Tools Needed:
10
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the
Find a Dealer section online at www.wayne-dalton.com
(2) 1/4”-14 x 5/8” sElf DRIllING sCREWs
NOTE: Double car door struts are color
coded. 18 gauge (.046) have red ends. 20
gauge (.034) have blue ends.
bottom Section:
1. If your doors windload option code
begins with 06,
place the u-bar with the
notched ends over the bottom rib of the
bottom section, notches facing down.
Center u-bar left to right on section.
If your doors windload option code begins
with 02,
place the u-bar with the notched
ends over the bottom rib of the bottom
section, notches facing down. The end
of the u-bar will fit between the bottom
bracket flange and the bottom section rib.
Center u-bar left to right on section.
2. fasten the u-bar at each end through
the top flange with (1) 1/4”-14 x 7/8”
self drilling screw. If your doors windload
option code begins with 02, also fasten
the u-bar at each end to the bottom
section rib with (2) 1/4”-14 x 5/8” self
drilling screws, through the two holes in
the bottom bracket flange.
3. Place (2) 1/4”-14 x 5/8” self tapping
screws through each pre-punched hole at
each intermediate hinge location.
4. Place the u-bar over the top rib of
the bottom section with the eight pre-
punched holes, facing up. Center u-bar
left to right on section. attach the u-bar
at each end through the bottom flange
with (1) 1/4”-14 x 7/8” self drilling screw.
5. finish securing the u-bars to the
section, by placing (2) 1/4” -14 x 5/8”
self tapping screws midway between the
end of the door and intermediate hinge
locations and (1) 1/4” -14 x 5/8” self
tapping screw approximately eight inches
from each end.
Intermediate/ Top Section(s):
1. Place the u-bar over the top rib of each
of the remaining sections with the (8)
pre-punched holes at the ends, facing up.
Center u-bar left to right on section.
2. fasten the u-bar(s) at each end
through the top and bottom flange with (2)
1/4”-14 x 7/8” self drilling screws.
3. Place (2) 1/4”-14 x 5/8” self tapping
screws through each intermediate hinge.
4. finish securing the u-bar(s) to the
section, by placing (2) 1/4” -14 x 5/8”
self tapping screws midway between the
end of the door and intermediate hinge
locations and (1) 1/4” -14 x 5/8” self
tapping screw approximately eight inches
from each end.
Attaching U-bars
1/4”-14 x 5/8” sElf
TaPPING sCREWs
u-baR
NOTChED u-baR
1/4”-14 x 5/8”
sElf TaPPING sCREWs
1/4”-14 x 7/8”
sElf DRIllING
sCREWs
u-baR
Power Drill
7/16” socket
Driver
saw horses
5
bOTTOM sECTION
INTERMEDIaTE sECTION
INTERMEDIaTE sCREW
PlaCEMENT
INTERMEDIaTE sCREW
PlaCEMENT
1/4”-14 x 5/8” sElf
TaPPING sCREWs
1/4”-14 x 7/8” sElf DRIllING
sCREWs
fOR OPTION CODEs sTaRTING WITh 02
flaNGE
u-baR
RIb
fOR OPTION CODEs sTaRTING WITh 06