Installation, Framing and finishing, Bc a – Regency SEE THRU P121-NG User Manual
Page 10
Regency P121/P121LC/P121RC/P131 Zero Clearance Room Sealed Gas Fireplace
10
B
C
A
FRAMING AND FINISHING
CAUTION: The unit does not have to be completely enclosed in
a chase. The clearance on top of the unit is 0" to the standoffs
so combustible building materials can be laid directly on top of
the standoffs. You must maintain clearance from the flue to
combustible materials for both rigid and flex, see Flue Clear-
ances, page 9.
P121 - See Thru
P131 - Pier
Framing Dimensions
P121 (See Thru) P131 (Pier)
P121LC / P121RC
(Corner Unit)
A 25"(635mm)
25"(635mm)
26-13/13"(660mm)
minus two times
minus two times
minus two times
the finishing
the finishing
the finishing
material thickness* material thickness* material thickness*
B 42-1/2"(1080mm) 42-1/2"(1080mm)
42-1/2"(1080mm)
C 46-3/4"(1187mm) 45" (1143mm)
45"(1143mm)
minus one time
minus one time
the finishing
the finishing
material thickness* material thickness*
Note: These units are
non-load bearing.
P121LC - Corner Unit
* Finish material thickness includes: drywall, ceramic tile, slate, etc.
1) For ease of installation, frame your fireplace after it is positioned and
the flue system is installed. Remember to install the top standoffs.
See page 11 for assembly. Use 2x4's and frame to local building
codes.
2) When locating your appliance on an exterior wall or in a chase, apply
a vapour barrier and drywall, as per local building codes. DO NOT
INSULATE THE FIREPLACE ITSELF.
CAUTION: Verify your fireplace dimensions, framing methods
and finished wall facing details before framing. Determine the
total thickness of facing material - drywall plus ceramic tiles,
slate, etc. Allow the finish surface to be flush with the front or
side of the unit. Total facing thickness can vary from 1/2"
(13mm) to 1-1/4" (32mm) thick.
P121RC - Corner Unit
INSTALLATION