beautypg.com

Installation, Framing and finishing, Bc a – Regency SEE THRU P121-NG User Manual

Page 10

background image

Regency P121/P121LC/P121RC/P131 Zero Clearance Room Sealed Gas Fireplace

10

B

C

A

FRAMING AND FINISHING

CAUTION: The unit does not have to be completely enclosed in

a chase. The clearance on top of the unit is 0" to the standoffs

so combustible building materials can be laid directly on top of

the standoffs. You must maintain clearance from the flue to

combustible materials for both rigid and flex, see Flue Clear-

ances, page 9.

P121 - See Thru

P131 - Pier

Framing Dimensions

P121 (See Thru) P131 (Pier)

P121LC / P121RC

(Corner Unit)

A 25"(635mm)

25"(635mm)

26-13/13"(660mm)

minus two times

minus two times

minus two times

the finishing

the finishing

the finishing

material thickness* material thickness* material thickness*

B 42-1/2"(1080mm) 42-1/2"(1080mm)

42-1/2"(1080mm)

C 46-3/4"(1187mm) 45" (1143mm)

45"(1143mm)

minus one time

minus one time

the finishing

the finishing

material thickness* material thickness*

Note: These units are

non-load bearing.

P121LC - Corner Unit

* Finish material thickness includes: drywall, ceramic tile, slate, etc.

1) For ease of installation, frame your fireplace after it is positioned and

the flue system is installed. Remember to install the top standoffs.

See page 11 for assembly. Use 2x4's and frame to local building

codes.

2) When locating your appliance on an exterior wall or in a chase, apply

a vapour barrier and drywall, as per local building codes. DO NOT

INSULATE THE FIREPLACE ITSELF.

CAUTION: Verify your fireplace dimensions, framing methods

and finished wall facing details before framing. Determine the

total thickness of facing material - drywall plus ceramic tiles,

slate, etc. Allow the finish surface to be flush with the front or

side of the unit. Total facing thickness can vary from 1/2"

(13mm) to 1-1/4" (32mm) thick.

P121RC - Corner Unit

INSTALLATION

This manual is related to the following products: