beautypg.com

Installation, Installation procedures – Regency G36D User Manual

Page 22

background image

UltraGlow

®

G36D Zero Clearance Direct Vent Gas Fireplace

®

®

22

4) Separate the 2 halves of the wall thimble and

securely fasten the one with the tabs to the

outside wall making sure that the tabs are

on top and bottom. Fasten the other thimble

half to the inside wall. The thimble halves

slip inside each other and can be adjusted

for 2 x 4 or 2 x 6 walls. The liners must slip

over the collars a minimum of 1-3/8".

5) Slip the assembled liner and termination

assembly through the thimble making sure

the termination cap faces up (there are

markings on the cap that show which way

is up). This will position the termination cap

with proper down slope for draining water.

Fasten the cap to the outer wall with the 4

supplied screws.

6) Pull the centre 4"(100mm) liner and outer

6-7/8"(175mm) liner out enough to slip over

the fl ue collars of the fi replace. (You may

wish to cut the liner shorter to make it more

workable.) Do not bend liner more than

90

o

.

7) Apply Mill Pac over the fi replace inner collar

and slip the 4"(100mm) liner down over it

and attach with 3 supplied screws.

8) Do the same with the 6-7/8"(175mm) liner.

9) Apply a bead of silicone between the thimble

and termination and around the outer edge

of the terminal at the wall in order to keep

the water out.

IMPORTANT: Do not locate termination

hood where excessive snow or ice

buildup may occur. Be sure to check vent

termination area after snow falls, and clear

to prevent accidental blockage of venting

system. When using snow blowers, make

sure snow is not directed towards vent

termination area.

N o t e : To m a k e

t h e i n s t a l l a t i o n

more aesthetically

p l e a s i n g , w e

recommend framing

out a square to mount

the terminal to.

Offset Chart

INSTALLATION

PROCEDURES

for UltraGlow

®

for UltraGlow

for UltraGlow Direct Vent

®

®

System (Flex)

1) Locate the unit in the framing, rough in the

gas (preferably on the right side of the unit)

and the electrical (Junction block is on the

left side) on the left. Locate the centerline of

the termination and mark wall accordingly.

Cut a 10"(254mm) hole in the wall (inside

dimension).

Note: A 1-1/2"(38mm) clearance around

the liner must be maintained except

that only a 1" (25mm) clearance is

needed at the termination end. We

recommend framing a 10"(254mm)

x 10"(254mm) (inside dimensions)

hole to give structural rigidity for

mounting the termination.

Note: If installing termination on a siding

siding

covered wall, furring strips must be

covered wall, furring strips must be

used to ensure that the termination

is not recessed into the siding.

2) Level the fi replace and fasten it to the framing

using nails or screws through the nailing

strips.

3) Assemble the vent assembly by applying

Mill Pac to the 4"(100mm) inner collar of the

termination and slipping the 4"(100mm) liner

over it at least 1-3/8" (35mm). Fasten with

the 3 screws (drilling pilot holes will make this

easier). Apply Mill Pac or high temperature

silicone to the 6-7/8"(175mm) fl ex pipe and

slip it over the 6-7/8" outer collar of the vent

terminal at least 1-3/8"(35mm) and fasten

with the 3 screws.

NOTE: Horizontal sections must be

supported at intervals not exceeding

3 feet (0.9 meter). (Flame picture and

performance will be affected by sags

in the liner).

steep roof pitches, the vertical height must

be increased. A poor draft, or down drafting

can result from high wind conditions near big

trees or adjoining roof lines, in these cases,

increasing the vent height may solve the

problem.

7) Ensure vent is vertical and secure the base

of the fl ashing to the roof with roofi ng rails,

slide storm collar over the pipe section and

seal with a mastic.

8) Install the vertical termination cap by twist-

locking it.

Note: Any closets or storage spaces, which

the vent passes through must be

enclosed.

INSTALLATION