Ending an active test – Paradyne M/HDSL Standalone Termination Unit HOTWIRE 7986 User Manual
Page 67
Testing
5-9
7986-A2-GB20-10
December 1998
Ending an Active Test
Except for the Remote Send Line Loopback and Remote DCLB, a test initiated by
the user can be ended by the user. Tests can also be terminated automatically by
enabling the Test Timeout option from the System Options Menu.
H
A Test Timeout option is available to automatically terminate a user-initiated
Loopback or Pattern test (as opposed to manually terminating a test) after it
has been running a specified period of time. The default is 10 minutes.
Refer to Table A-3,
Test Timeout does not pertain to tests initiated by the network.
H
On each test screen is a Command column. To stop the test, press Enter
when the cursor is on the Stop command.
H
Use the Abort All Tests selection from the Test menu to stop all tests running
on all interfaces, with the exception of network-initiated loopbacks.
Command
Complete
appears when all tests on all interfaces have been terminated.
An aborted test may continue to run for a few seconds as the abort command
is sent to the remote end and processed.