beautypg.com

Precautions for transportation, 7 precautions on transportation of unit – Pioneer Multi Projection System RM-V1000NU User Manual

Page 28

background image

27

INSTALLATION AND ASSEMBLY

3. PRECAUTIONS FOR TRANSPORTATION

Do not stack the units on their sides or backs when transporting them.
Always place them upright. If they are stacked on their sides or backs, vibration and shock may cause damage or

fire hazards.

7 Precautions on transportation of unit

¶ Because it damages easily when dropped, exposed to shock or vibrations, be careful not to place heavy

objects on the unit nor drop it in transportations.

¶ Always place the unit on its side, never upright, in transportation.
¶ Do not place objects on the unit when storing it due to the simple packing.

7 Precautions on transportation of projection screen

* As Projection screen must always be installed, it will not need to be re-packed and transported. Packaging

instructions are provided for your reference just in case it has to be transported again.

¶ Pack it properly according to the packaging specifications (Fig.3-6). Also check the following conditions.

[1] The protection panel has been properly attached by the transportation screws (eight).

* Use the protection screws (gold) provided with the unit.

[2] The protection tapes are pasted to the four corners of the protection panels.

* Paste the protection tape on the protection panel.
* Use a relatively weak tape about 20 mm to 30 mm in width.


Name

:Acetate cloth adhesive tape (25 mm width)

PP bands

Top pad

Upper carton

Mirror mats

Projection screen

Bottom pad

Under carton

Top side

Protection panels

Right side

(Fig.3-6)

Protection tape

Transportation screws (Eight, gold)

Protection

tape

Protection

tape