beautypg.com

Installation and assembly, 1) confirmation, 2) opening the packaging – Pioneer Multi Projection System RM-V1000NU User Manual

Page 23

background image

22

INSTALLATION AND ASSEMBLY

2. INSTALLATION AND ASSEMBLY

(1) Confirmation

1 Decide the position for installing the system according to the installation conditions in Chapter 3.

Check Items

[1] Dimensions of installing position, space at the back, distance to the ceiling
[2] Floor flatness, strength, roughness
[3] Position of power supply

[4] Installing location

Need for protection for the floor, walls, etc. (support covers, sheets, cover boards, etc.), width of the areas
and paths used for moving the system in and out, if elevators are used, its size and weight limit, etc.

[5] Position, specifications, and structure of a transmission equipment, and image type
[6] Model number of equipment used, and their quantity (perform according to list).

Check if there is enough equipment for each unit

* These procedures must be performed by only one person.

(2) Opening the Packaging

1 Packaging specifications

[1] Projection Screen Kit (

×

4

)

: 1126(W)

×

230(H)

×

879(D)mm 20.2kg

[2] Unit(

×

2

)

: 2225(W)

×

1200(H)

×

1105(D)

Unit R :

310kg

Unit L :

303kg

2 Opening the packaging

Open from the big ones first and put the small packagings inside the empty big packagings. Also dispose or
store the packagings.

Do not mix up the opened items with those still in the packaging.
Move the empty packagings somewhere else so that they will not come in the way. Next, obtain an assembly
space that is as wide as possible.
* Turn down the opened packagings upside down to differentiate them from those not opened.

Do not lose accessories, the warranty card, etc.