beautypg.com

Vertical direct venting, Vent/air termination – vertical – Lochinvar Shield SNR150-100 User Manual

Page 30

background image

30

4

Vertical direct venting

Vent/air termination – vertical

Prepare roof penetrations

1. Air pipe penetration:

a. Cut a hole for the air pipe. Size the air pipe hole as

close as desired to the air pipe outside diameter.

2. Vent

pipe

penetration:

a. Cut a hole for the vent pipe. For either

combustible or noncombustible construction, size

the vent pipe hole with at least a 1/2 inch clearance

around the vent pipe outer diameter:

• 4½ inch hole for 3 inch vent pipe

• 5½ inch hole for 4 inch vent pipe

b. Insert a galvanized metal thimble in the vent pipe
hole.

3. Space the air and vent holes to provide the minimum

spacing shown in FIG. 4-1A, page 29.

4. Follow all local codes for isolation of vent pipe when

passing through floors, ceilings, and roofs.

5. Provide flashing and sealing boots sized for the vent

pipe and air pipe.

Termination and fittings

1. Prepare the vent termination coupling and the air

termination elbow (FIG. 4-1A) by inserting bird screens.
Bird screens should be obtained locally.

2. The air piping must terminate in a down-turned 180°

return bend as shown in FIG. 4-1A. Locate the air
inlet pipe no further than 2 feet from the center of the
vent pipe. This placement avoids recirculation of flue
products into the combustion air stream.

3. The vent piping must terminate in an up-turned

coupling as shown in FIG. 4-1A. The top of the coupling
must be at least 1 foot above the air intake. When the
vent termination uses a rain cap as illustrated in FIG.
4-1B maintain at least 36" (914 mm) above the air inlet.
The air inlet pipe and vent pipe can be located in any
desired position on the roof, but must always be no
further than 2 feet apart and with the vent termination
at least 1 foot above the air intake.

4. Maintain the required dimensions of the finished

termination piping as shown in FIG. 4-1A.

5. Do not extend exposed vent pipe outside of building

more than shown in this document. Condensate could
freeze and block vent pipe.

Multiple vent/air terminations

1. When terminating multiple Shield water heaters, terminate

each vent/air connection as described in this manual

(FIG. 4-2).

Terminate all vent pipes at the same height
and all air pipes at the same height to avoid
possibility of severe personal injury, death,
or substantial property damage.

2. Place roof penetrations to obtain minimum clearance of

12 inches between edge of air intake elbow and adjacent
vent pipe of another water heater for U.S. installations (see
FIG. 4-2). For Canadian installations, provide clearances
required by CSA B149.1 Installation Code.

3. The air inlet of a Shield water heater is part of a direct vent

connection. It is not classified as a forced air intake with
regard to spacing from adjacent water heater vents.

Figure 4-2 Vertical Terminations with Multiple Water
Heaters

Figure 4-3 Alternate Vertical Terminations with Multiple
Water Heaters

ƽ WARNING

Installation & Service Manual

TM