beautypg.com

Planning worksheet 5 of 5 – Sun Microsystems StorageTek 96257 User Manual

Page 107

background image

Sun Confidential: Internal Only

Planning Worksheet 5 of 5

> [electronic form] <

Account __________________________ Completed By ____________________ Date ___________

AC Power Factors

Information to Note / Comments

5A. Does the installation site have capability for grounding

the VTSS cabinet(s)?

5A.

5B. Is the installation site close enough to source power

connectors / outlets to accommodate the power cord
lengths ordered for the VTSS cabinet(s)?

5B.

5C. Are power cable routing paths readily accessible to fa-

cilitate cable connection / disconnection and servicing?

5C.

Host System and Application Software Factors

Information To Note / Comments

5D. What host operating system software will be used with

this VSM solution configuration? Requirements:
(1) MVS 5.2.2 or higher. (2) All versions of OS390.

5D.

(1) _____________________________________

(2) _____________________________________

5E. What application software release levels (SRLs) will be

installed for use with this VSM solution configuration?
Requirements: For back-end FICON (1) VTCS.
(2) NCS 6.1 or higher (includes HSC 6.1).

5E.

(1) _____________________________________

(2) _____________________________________

5F. What patches, if any, are needed for host and applica-

tion software to run properly with this VSM solution
configuration? Key: (1) = VTCS. (2) = NCS. (3) = MVS.
(4) = OS390.

5F.

(1) _____________________________________

(2) _____________________________________

(3) _____________________________________

(4) _____________________________________

Remote Support Factors

Information To Note / Comments

5G. What components will the customer provide to enable

remote event notification functionality for this VSM solu-
tion?

5G.

5H. What components will Sun Microsystems provide to en-

able remote event notification functionality for this VSM
solution?

5H.

5I. What cable types and lengths are needed to attach a

modem, SDP device, or other remote monitoring com-
ponents to the VTSS cabinet(s)?

5I.

Additional Information to Note / Comments (Specify By Above Item Number):