beautypg.com

Middleby Marshall RED LOBSTER PS200-R68 User Manual

Page 59

background image

53

SECTION 4

MAINTENANCE

IV. MAINTENANCE - EVERY 6 MONTHS

NOTE: It is recommended that the 6 Month Maintenance schedule be performed by an Authorized Middleby Marshall
Service Agent.

CAUTION:

All electrical power should be shut OFF

and locked out or tagged out before attempting

maintenance in steps "A" thru "C".

A. Check brushes on D.C. conveyor motor, when worn to less than 3/32" (2.2mm) replace.

B. Burner nozzle and electrode assembly should be cleaned and inspected. Also check your oven venting system.

C. Check conveyor shaft bushings and spacers. Replace them if they are worn.

The following parts were shipped inside the control compartment of your oven to be used
for preventive maintenance or as spares. It is recommended that whenever you use one
of these parts you should order a replacement from your local authorized Middleby
Marshall Parts Distributor.

MAINTENANCE PARTS

QUANTITY

MIDDLEBY MARSHALL

DESCRIPTION

PART NUMBER

2

28154-0003

TRM 9 Amp Fuse (See Figure 6-3)

1

22181-0034

Fan Belt (Refer to previous

page for fan belt replacement.