Chapter 4

Practical Examples of DR

4-13

4.5.1

Example: Replacing a Uni-XSB System Board

FIGURE 4-8

Example: Replacing a Uni-XSB System Board

1. Login to XSCF.

2. Check the status of the domain.

Execute the showdcl(8) command to display domain information, and then
check the operation status of the domain. Based on the operation status of the
domain, determine whether to perform the DR operation or replace the system
board after stopping the domain.

3. Check the status of the system board to be replaced.

Execute the showboards(8) command to display system board information, and
then check the status of the system board to be deleted. The DR operation for
replacement may not be possible if the board to be replaced does not support the
DR delete operation.

XSCF> showdcl -d 0

DID

LSB

XSB

Status

00

Running

00

00-0

01

01-0

XSCF> showboards 01-0

XSB

DID(LSB)

Assignment

Pwr

Conn

Conf

Test

Fault

-----------------------------------------------------------------

01-0

00(01)

Assigned

y

y

y

Passed

Normal

Domain#0

XSB#00-0

XSB#01-0

Delete

Faulty

New

Replace

Add

system
board

system
board