beautypg.com

Installation guide (h aio 163) – Hisense HAIO163 163" Full HD HDR All-in-One LED Commercial Display User Manual

Page 45

background image

40

12

1000mm

410mm

1800mm

Cross beam

615

mm

(4) The arrow direction of the cross beam is the upper side direction of the mobile bracket. According to

the direction shown in the Figure, insert the mounting tenons on the left and right struts of the mobile

bracket into the cross beam, and then fix 30 screws M8×25 fixing screws and washers that connect

these six components (avoid fixing them too tightly for the time being).

Note: It is recommended that two persons install the left and right sides at the same time in order to
maintain balance, and the two persons should keep the same synchronization. In the up and down
direction of the left and right columns, as shown in the Figure, allow the two L-shaped auxiliary support
hooks to face upward.

Installation Guide (H

AIO

163)

615

mm

277.5

mm

LED All-In-One User Manual

1. Preparatory Process

Check the package integrity

2. Mobile Bracket Assembly

(1) Unpack and check the material integrity of mobile bracket, including four pieces of cross beams, two
pieces of columns on the left and right, totaling six components.
(2) Use the existing table top or packing cabinets to temporarily form a table top, with a length of not
less than 1800 mm, a width of not less than 1000 mm, a height of not less than 410mm, and pavement
of a protective table cloth.
(3) Place four pieces of cross beams on the installation table top according to the direction shown in the
Figure. Note: The arrow faces upward, the arrows of the four beams are in the same direction, and the
distance between the four beams is about 615mm. The distance between the third piece and the fourth
piece is about 277.5mm.