Hisense HAIO163 163" Full HD HDR All-in-One LED Commercial Display User Manual
Page 35

30
Note:
In the above installation process, if the deviation between the cabinet and the screw position of the
connecting block is too large to be fixed, there is need to loosen the two screws of the connecting block
and the mobile cart frame
in
Page-
Step
4
, so that the connecting block and the surrounding cabinets
can be connected normally, and then tighten the above-mentioned screws.
(1)
Wiring between cabinets.
In columns, Connect the network cables and power cables of HUB board at the corresponding
position, as shown in the Figure.
(2)
Wiring between No. 1strow of cabinets and the bottom beam
Pass the network cable and power cable on the bottom beam, and connect to the corresponding
socket located at the first row cabinets’ HUB board.
(3)
Power-on check.
(1)
Install front frame 12 pieces of M3 M3x6screws in total.
(2)
Install left front frame, 7 pieces of M3 M3x6screws in total.
(3)
Install right front frame, 7 pieces of M3 M3x6screws in total.
Detail A
Detail B
Detail A
Detail B
LED All-In-One User Manual
3. Wiring -- Before wiring operation, check that the power cord is in the
unconnected state
4. Installation of side frame and upper frame