beautypg.com

Installation steps of the mobile cart – Hisense HAIO163 163" Full HD HDR All-in-One LED Commercial Display User Manual

Page 29

background image

NOTE:

Installation Steps of the MOBILE CART

Step 1:

As shown in the figure below, use the existing worktable or the packing box as temporarily worktable, with a length

not less than 1300mm, a width not less than 1000mm, a height not less than 410mm, and lay a protective worktable

cloth.

Step 2:

Place the three Horizontal beams on the installation worktable according to the direction shown in the figure.

Note: the arrow face is upward, the arrow direction of the three beams are the same, and the distance between

these three beams is about 573.75mm.

Step 3:

The arrow direction of the crossbeam is the Top side direction of the Mobile Cart. According to the direction shown

in the figure, insert the installation screws on the left and right pillars of the Mobile Cart into the crossbeam, and

then fix the 22 Pcs M8×25 fixing screws and gaskets connecting these five parts (do not fix them too tightly for the

time being).

It is recommended that two people install the left and right sides at the same time to maintain balance. At the

same time, the position of aligning the three beams needs to be accurate, and the two people should keep

synchronized.

In the up-down direction of the left and right columns, put the two L-shaped auxiliary support hooks upward as

shown in the figure. Put the Mobile Cart upright, and tighten 22 fixing screws after checking that there is no

abnormality.

24

LED All-In-One User Manual

Columns on both sides

M8 fixing screws and

gaskets (30 in total)