Installation Instructions

ELPMBPJG

7

Installing to Solid Concrete

1.

Using the ceiling plate (B) as a guide, mark mounting hole

locations (two minimum) on ceiling. (See Figure 4)

IMPORTANT ! :

Ensure that

OPPOSITE

holes are used in

plate (B).

2.

Drill two (minimum) pilot holes as follows: (See Figure 4)

Toggler AF8: 5/16" x 2-3/4"

Fischer UX10: 3/8" x 2-3/4"

Figure 4

3.

Align two mounting holes in ceiling plate with two pilot holes.

WARNING:

Anchors (not provided) must be installed into

structurally sound solid concrete. Installation into hollow

concrete block, mortar, or concrete that exhibits cracking,

spalling, or other defects may result in failure of anchor and

serious personal injury or damage to equipment.

4.

Install two Fischer UX10 or Toggler AF8 concrete anchors

(not included) into pilot holes until flush with mounting

surface. (See Figure 5)

5.

Loosely secure ceiling plate (B) to structure using two

(minimum) 5/16" x 2-3/4" lag bolts (H1). (See Figure 5)

Figure 5

NOTE:

Do not tighten ceiling plate (B) against ceiling at this

time to accommodate cable installation.

6.

Route cables through channel in ceiling plate (B). (See

Figure 6)

Figure 6

7.

Tighten lag bolts. (See Figure 5)

Installing Fixed Pipe

WARNING:

Exceeding the weight capacity can result in

serious personal injury or damage to equipment! It is the

installer’s responsibility to make sure the combined weight of

all components attached to the ELPMBPJG does not exceed

25 lbs (11.4 kg).

1.

Install 3" fixed pipe (A) into threaded collar of ceiling plate

(B) until tight, with a minimum of four threads engaged. (See

Figure 7)

2.

Secure extension column by

one

of the following methods:

(See Figure 7)

Install one 5/16" x 1/4" set screw (E1) into threaded

hole in ceiling plate (B), tightening firmly against

column.

OPTIONAL:

Using 5/32" security hex key (G2), install

one 5/16" x 1/4" security set screw (E2) into threaded

hole in ceiling plate (B), tightening firmly against

column.