beautypg.com

Installation, Installing ceiling plate – Epson Universal Projector Mount with 3" Extension Column User Manual

Page 6

background image

ELPMBPJG

Installation Instructions

6

INSTALLATION

WARNING:

Failure to provide adequate structural strength

for this component can result in serious personal injury or
damage to equipment! It is the installer’s responsibility to
make sure the structure to which this component is attached
can support five times the combined weight of all equipment.
Reinforce the structure as required before installing the
component.

Installing Ceiling Plate

1.

Determine mounting location.

IMPORTANT ! :

This will require knowing the lens to

screen distance. See projector specifications for details
on determining this distance

NOTE:

Proceed to

Installing to Wood Joists

or

Installing to

Solid Concrete

section dependent upon whether the

ceiling plate will be installed to wood joists or concrete.

Installing to Wood Joists

1.

Using ceiling plate (B) as a template, mark locations of two

pilot holes. (See Figure 1) Ensure the following:

OPPOSITE

holes are used in plate (B), and

Marks are in the center of wood joist.

NOTE:

Drywall not shown for clarity.

Figure 1

2.

Drill 7/32" x 2-3/4" pilot holes into narrow side of wood joist.

Ensure pilot holes are straight.

Figure 2

3.

Loosely install two (minimum) 5/16" x 2-3/4" lag screws (H1)

through 5/16" washers (H2) and ceiling plate (B), into wood

joist. (See Figure 2)

NOTE:

Do not tighten ceiling plate (B) against ceiling at this

time to accommodate cable installation.

NOTE:

Two additional washers and lag screws are provided.

4.

Route cables through channel in ceiling plate (B). (See

Figure 3)

Figure 3

5.

Tighten lag screws (F). (See Figure 2)

1

x 2

(B)

3

(H1 x 2)

2

x 2

5

(B)

(H2) x 2

4

(B)