Installation, 1 hardware installaion, 1 unpack the umg-2000 series – PLANET UMG-2000 User Manual
Page 17: 2 choosing a setup location
17
2. Installation
The followings are instructions for setting up the UMG-2000 Series. Refer to the illustration
and follow the steps install your unified office gateway.
2.1 Hardware Installaion
2.1.1 Unpack the UMG-2000 Series
Note:
You should inspect the box which the system was shipped in and note if it was damaged in any way
before the unpacking. If the UMG-2000 Series itself shows damage you should file a damage claim
with the carrier to who delivered it. Unpack the UMG-2000 Series as listed below.
2.1.2 Choosing a Setup Location
Decide on a suitable location for the UMG-2000 Series which should be situated in a clean,
dust-free, and well ventilated area. Avoid areas where heat, electrical noise and
electromagnetic fields are generated. Place the UMG-2000 Series near a grounded power
outlet and pay attention to the following requirements.
Leave approximately 40cm (16inche) of clearance in front of the UMG-2000 Series
to ensure the disk carriers can be unplugged.
Leave approximately 30cm (12 inch) of clearance in the back of the UMG-2000
Series to allow for sufficient airflow and ease in servicing.