5 Electrical Connection

Installation Guide

AS-BOX-M_L-IA-IEN110320

39

1. Insert the cable (see section 5.2).
2. Connect PE to terminal strip "AS-X1/ Load Meter". Take the labeling on the connection terminals

into account.

3. If a TN system is present:

– Bridge the connection terminal "N-TT" and

"N-TN" of the terminal strip "AS-X1/ Load
Meter" by using a push-in type jumper bar. Take
the label "TN-TT" in the Automatic Switch Box
into account.

– Connect N to connection terminal "N-TN" of the terminal strip "AS-X1/ Load Meter". Take

the label "TN-TT" in the Automatic Switch Box into account.

4. If a TT system is present:

– If connection terminals "N-TT" and "N-TN" of the terminal strip "AS-X1/ Load Meter" are

bridged, remove the bridge.

– Connect N to connection terminal "N-TT" of the terminal strip "AS-X1/ Load Meter". Take the

label "TN-TT" in the Automatic Switch Box into account. The second connection terminal
"N-TT" is not assigned.

5. Connect L1, L2 and L3 to terminal strip "AS-X1/ Load Meter". Take the labeling on the

connection terminals into account.