Page 36

6. If an additional grounding or equipotential bonding is connected, loosen the cylindrical screw
M6x16 and remove the screw, conical spring washer, clamping bracket and grounding
conductor.
7. Position the enclosure lid on the enclosure using the six screws and tighten all screws
diagonally to each other using an Allen key (AF 5) (torque: 6 Nm ± 0.5 Nm).
8. Remove the battery by lifting it vertically up and
off the wall mounting bracket.
9. Remove the inverter by lifting it vertically up and
off the wall mounting bracket.
10. If the inverter is to be stored or shipped, pack the inverter and the protective cover of the
battery. Use the original packaging or packaging that is suitable for the weight and
dimensions of the inverter and the protective cover.
11. Dispose of the inverter in accordance with the locally applicable disposal regulations for
electronic waste.
12.
Danger to life due to incorrect packaging and transport of the Battery Pack
The Battery Pack is considered to be dangerous goods. If the Battery Pack is to be transported,
special regulations must be complied with for packaging and transport.
• When packaging and transporting the Battery Pack, observe the regulations of the
European Agreement concerning the International Carriage of Dangerous Goods by
Road (ADR).
• Packaging and transport of the Battery Pack may only be carried out by persons who
have been trained in accordance with Section 1.3 ADR and whose training has been
documented.
10 Decommissioning the Inverter
SMA Solar Technology AG
Service Manual
SB36-50SE-SG-en-10
36