beautypg.com

SMA SB 3600SE-10 Service Manual User Manual

Page 36

background image

6. If an additional grounding or equipotential bonding is connected, loosen the cylindrical screw

M6x16 and remove the screw, conical spring washer, clamping bracket and grounding
conductor.

7. Position the enclosure lid on the enclosure using the six screws and tighten all screws

diagonally to each other using an Allen key (AF 5) (torque: 6 Nm ± 0.5 Nm).

8. Remove the battery by lifting it vertically up and

off the wall mounting bracket.

9. Remove the inverter by lifting it vertically up and

off the wall mounting bracket.

10. If the inverter is to be stored or shipped, pack the inverter and the protective cover of the

battery. Use the original packaging or packaging that is suitable for the weight and
dimensions of the inverter and the protective cover.

11. Dispose of the inverter in accordance with the locally applicable disposal regulations for

electronic waste.

12.

Danger to life due to incorrect packaging and transport of the Battery Pack
The Battery Pack is considered to be dangerous goods. If the Battery Pack is to be transported,
special regulations must be complied with for packaging and transport.

• When packaging and transporting the Battery Pack, observe the regulations of the

European Agreement concerning the International Carriage of Dangerous Goods by
Road (ADR).

• Packaging and transport of the Battery Pack may only be carried out by persons who

have been trained in accordance with Section 1.3 ADR and whose training has been
documented.

10 Decommissioning the Inverter

SMA Solar Technology AG

Service Manual

SB36-50SE-SG-en-10

36

This manual is related to the following products: