10 decommissioning the inverter – SMA SB 3600SE-10 Service Manual User Manual
Page 35
10 Decommissioning the Inverter
Risk of injury through lifting or dropping the inverter or Battery Pack
The inverter and the Battery Pack are heavy (for weight, see operating manual at
Solar.com). There is risk of injury if the inverter or Battery Pack are lifted incorrectly or dropped
• Hold the inverter by the right-hand and left-
hand recessed grips, and lift and transport it to
the mounting position horizontally.
• Lift and transport the Battery Pack by the
lateral handles.
1.
Danger to life due to high voltages
• Disconnect the inverter from all voltage sources (see Section 2.3, page 8).
2. Remove the AC cable from the inverter. Also push the locking levers right up to the top and
pull out the cables.
3. Press down the locking levers of the connecting terminal plate for the AC cable.
4. If an Ethernet cable is connected for Speedwire communication, remove the cable from the
inverter.
5. If other cables are connected to the inverter, remove the connection cables from the inverter.
10 Decommissioning the Inverter
SMA Solar Technology AG
Service Manual
35
SB36-50SE-SG-en-10