Rear panel main power switch -3, Front panel power switch -3, Figure 3-1 – Grass Valley PDR 200 Installation User Manual
Page 69: Figure 3-2
Turning Power On
Profile Video File Server Installation
3-3
5. Wait approximately 1 to 2 minutes.
6. On the rear panel of the Profile Video File Server (see Figure 3-1), turn the main
power switch to
l
(On).
7. On the front panel of the Profile Video File Server (see Figure 3-2), turn the power
switch to On.
Figure 3-1. Rear Panel Main Power Switch
Figure 3-2. Front Panel Power Switch
9676-52
Main Power
Switch
9676-19
Front Panel
Power Switch
This manual is related to the following products: